Facultad de Ingeniería y Arquitectura

Permanent URI for this communityhttps://staging-repositorio.uprit.edu.pe/handle/UPRIT/1

Browse

Search Results

Now showing 1 - 3 of 3
  • Some of the metrics are blocked by your 
    Item type:Item,
    Mejoramiento del sistema de agua y saneamiento y la calidad de vida de la población del cacerío de Catillambi distrito de Asunción-Cajamarca
    (Universidad Privada de Trujillo, 2016)
    Sánchez Ravichagua, Liliana Janet
    ;
    Padilla Ríos, Aurelio
    In the project design hydraulic calculations, establishing fixed parameter as the number of inhabitants to which they provide service, determining the approximate flow required for community and thus able to meet the domestic needs of the population were made. Known the required flow and distribution of the projection pipe in order to determine the pressure loss and studied. And use the proper diameter of the pipe to be used in the proposed project
  • Some of the metrics are blocked by your 
    Item type:Item,
    Ampliación del sistema de red de agua potable y alcantarillado frente a la calidad de vida de la población de los girasoles – El Milagro Sector III -Huanchaco-Trujillo-La Libertad
    (Universidad Privada de Trujillo, 2016-03)
    Reyes Caballero, Jhonathan Rafael
    ;
    Padilla Ríos, Aurelio
    As a result of analysis of the problematic reality presents as proposed solution the following project: “LA AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO FRENTE A LA CALIDAD DE VIDA DE LA POBLACIÓN DE LOS GIRASOLES EL MILAGRO SECTOR III, HUANCHACO - TRUJILLO - LA LIBERTAD”, - which can provide a solution to water deficiency, depriving the population to meet of their most basic needs. To provide drinking water, service adequate drinking water, installation Construction and Installation of Drinking Water and Sewerage arises, allowing improve the quality of life for residents of the housing association sunflowers, considering the following points: Water System • Supply and installation of 1981.30 ml. PVC pipe ISO 4222, Series 13.3 (C-7.5) DN (63-90-110) mm. UF type with rubber rings. • Installation of 287 household connections with PVC pipe DN 20mm C-10 type SP. System sewage • Construction of 34 concrete boxes F'c = 210kg / cm2. • Installation of 2537.10 ml. PVC pipe. S 20 UF. DN. 200mmde sewerage networks. • The connecting point of the proposed system with the existing system will be on Street Dean Saavedra. • Installation of 287 calculations for networks.
  • Some of the metrics are blocked by your 
    Item type:Item,
    La ampliación del sistema de agua y alcantarillado frente a la calidad de vida de la población del centro poblado de Galindo, distrito de Laredo, provincia de Trujillo - La Libertad
    (Universidad Privada de Trujillo, 2016)
    Honorio Alva, Jonny Andrés
    ;
    Honorio Alva, Jonny Andrés
    ;
    Padilla Ríos, Aurelio
    ;
    Padilla Ríos, Aurelio
    This project is framed within the sectoral objective to develop a proposal for a study on expanding WATER AND SEWER SYSTEM FROM THE QUALITY OF LIFE OF THE POPULATION OF THE TOWN CENTER GALINDO, DISTRICT OF LAREDO, PROVINCE OF TRUJILLO - FREEDOM. The study is descriptive and non experimental research because it presents a practical and according to the situation in which the population of the town center Galindo, District of Laredo - Province of Trujillo. Technique used is the direct and / observation and research tool by filling the respective observation sheet.